STEVE LEUNG DESIGN GROUP LIMITED 梁志天設計集團有限公司
The results date is the date on which the results were published, as stated in the annual directors' report or quarterly/interim report. The full report is usually filed later than results. Click the report name to open it, where linked.
Some data are hidden to fit your display. Rotate?
Type | Size MB |
Record date | Results date | Speed (days) |
Report filed |
---|---|---|---|---|---|
Interim Report | 0.3 | 2024-06-30 | 2024-08-29 | 60 | 2024-09-10 16:30 |
Annual Report | 3.0 | 2023-12-31 | 2024-03-27 | 87 | 2024-04-26 18:07 |
Interim Report | 1.0 | 2023-06-30 | 2023-08-28 | 59 | 2023-09-06 16:34 |
Annual Report | 6.0 | 2022-12-31 | 2023-03-28 | 87 | 2023-04-25 12:05 |
Interim Report | 0.5 | 2022-06-30 | 2022-07-28 | 28 | 2022-08-18 12:30 |
Annual Report | 3.0 | 2021-12-31 | 2022-03-21 | 80 | 2022-04-13 17:11 |
Interim Report | 0.6 | 2021-06-30 | 2021-08-26 | 57 | 2021-09-20 12:28 |
Annual Report | 3.0 | 2020-12-31 | 2021-03-29 | 88 | 2021-04-22 17:14 |
Interim Report | 0.3 | 2020-06-30 | 2020-08-27 | 58 | 2020-09-21 12:07 |
Annual Report | 1.0 | 2019-12-31 | 2020-03-30 | 90 | 2020-04-27 17:01 |
Interim Report | 0.4 | 2019-06-30 | 2019-08-19 | 50 | 2019-09-18 12:00 |
Annual Report | 1.5 | 2018-12-31 | 2019-03-11 | 70 | 2019-04-17 12:04 |
Interim Report | 0.3 | 2018-06-30 | 2018-08-28 | 59 | 2018-09-13 16:36 |
Sign up for our free newsletter
Recommend Webb-site to a friend
Copyright & disclaimer, Privacy policy